| MOLIN AZWA BINTI RAFIE | |||||
| Isnin | Selasa | Rabu | Khamis | Jumaat |
| 08:00-09:00 | KOMPOSISI SCENE SIJIL ANIMASI 2D 3B MOLIN AZWA BINTI RAFIE MAKMAL ANIMASI 2 |
|
ASAS ANIMASI 2D SIJIL ANIMASI 2D 1A MOLIN AZWA BINTI RAFIE MAKMAL ANIMASI 1 | ASAS ANIMASI 2D SIJIL ANIMASI 2D 1B MOLIN AZWA BINTI RAFIE MAKMAL ANIMASI 1 |
|
| 09:00-10:00 |
|
|
|||
| 10:00-10:15 | REHAT | REHAT | REHAT | REHAT | REHAT |
| 10:15-11:15 | KOMPOSISI SCENE SIJIL ANIMASI 2D 3B MOLIN AZWA BINTI RAFIE MAKMAL ANIMASI 2 | KOMPOSISI SCENE SIJIL ANIMASI 2D 3A MOLIN AZWA BINTI RAFIE MAKMAL ANIMASI 3 | ASAS ANIMASI 2D SIJIL ANIMASI 2D 1A MOLIN AZWA BINTI RAFIE MAKMAL ANIMASI 1 | ASAS ANIMASI 2D SIJIL ANIMASI 2D 1B MOLIN AZWA BINTI RAFIE MAKMAL ANIMASI 1 |
|
| 11:15-12:15 |
|
||||
| 12:15-13:15 | REHAT | ||||
| 13:15-14:15 | REHAT | REHAT | REHAT | REHAT | |
| 14:15-15:15 | ANIMASI KARAKTER SIJIL ANIMASI 2D 2A SIJIL ANIMASI 2D 3A(U) MOLIN AZWA BINTI RAFIE MAKMAL ANIMASI 4 | KOMPOSISI SCENE SIJIL ANIMASI 2D 3A MOLIN AZWA BINTI RAFIE MAKMAL ANIMASI 3 |
|
ANIMASI KARAKTER SIJIL ANIMASI 2D 2A SIJIL ANIMASI 2D 3A(U) MOLIN AZWA BINTI RAFIE MAKMAL ANIMASI 4 | |
| 15:15-16:15 | SPAK SIJIL ANIMASI 2D 3A SIJIL ANIMASI 2D 3A(U) SIJIL ANIMASI 2D 3B SIJIL ANIMASI 2D 4B(U) SIJIL ANIMASI 2D 5A MOHD FAUZAN BIN MD SARDI MOLIN AZWA BINTI RAFIE SURIAWATI BINTI MOHD FADZIL MAKMAL ANIMASI 3 |
|
|||
| 16:15-17:15 |
|
|
|
||
| 17:15-18:15 |
|
|
|
|
|
| 18:15-19:15 |
|
|
|
|
|
| Mimosa Scheduling Software 6.5.3 26/6/2026 11:03 |